These Aerobic Digesters are supplied with air from 3 blowers in a Blower House.
2.
The suspended solids are directed to the Gravity Belt Thickening Building, after which they are sent to 4 Aerobic Digesters each 58 meters long, 24 meters wide and 7 meters depth.